The No.4 Satin video
The production line including the No.4+ SB+ HL, the laminating procedure.
During the processing, adjusting the position of the abrasive belt and the sanding roller to process the plate by the control panel.
After processing, the polished plate should be convered with the film and un-feeding by the manual.
The plate of the line will be more than 1500 ton/ month, it also need to based on the thickness of the plate and the working hours.
Production Description
The universal type of the polishing machine is no.4 polishing machine, it cater to the raw coil and sheet to no.4 sand.
From the BA or 2B to the no.4 sanding, it cater to the universal industrial demand.
The width of the polishing machine is 800-1550 mm, the max length of the sheet and coil is 6000 mm, which we could make a processing, then we have improve the quality of the sanding brightness and decrease the roughness.
After we choose the finished product, we have check the brightness could be 354, the roughness is on the standard of 1.5 µm with the sample after finished by our polishing line.
And for the thinkness of the plate between 0.3-4.0 mm. We also customize polishing machine for the speical plate.
Application:
Our finished product will be suitable for
the automobile, household applicance,
Petrol chemical, Manufacture of machinery,
Energy, Transportation, Metal work, Aeronautiks and Astronautics, Nuclear power and Electronic instruments.
Production Details
The polishing part of the No.4 Satin machine central
The Back of the No.4 polishing machine
Production Parameter
The blank of the No.4 polishing machine
Specifications |
No.4-850-2(3) |
No.4-1250-2(3) |
No.4-1500-2(3) |
The grinding head |
2(3) |
2(3) |
2(3) |
Plate thickness (mm) |
0.4-3.0 |
0.4-3.0 |
0.4-3.0 |
Processing of plate width (mm) |
820 |
1250 |
1550 |
Processing speed (m/min) |
About 20 |
About 20 |
About 20 |
Weight (T) |
8(11) |
11(16) |
13.5 |
The total power unit (KW) |
63(85) |
90(128) |
106(155) |
OUYIGANG CNC Competitive Advantage
1. Our experienced designing engineer have been working more than 19 years experience in the stainless steel buffing sector. Many Chinese stainless steel buffing machine sector usd our polishing machine and gain good reputation. We keep on designing the innovative product.
2. Imported high-class material from America, Germany, Japan, etc. Prolong your buffing machine lifespan.
3. Our talent: 80 professional and skilled technicians and 10 master of optical profile grinding, CNC milling.
4. Our process skills are be industry leadership in buffing machine such as the mirror grinding and No.4 grinding.
5. We could adjust the suitable buffing machine according to the the customer's fact.
6. The latest delivery of the one produciton line will be 30-45 days. Before the shipment, we also test the machine each part of the line one by one with the electricity.
7. Our engineer will also provide the service for the user to prepare the basic procedure for the production line.
8. We provide the after sale service engineer to practise the user to operate the machine, install the machine and the dairy maintain.
9. And fitting tools and some machine parts of the line need to replace, we could provide the suitable fitting and be sured the quality.
Packing detail:
1. Covered with the transprant film.
2. Loading into the 40 HQ.
Customer question and answer (Q&A):
1. Q: What is the usage of the machine?
A: It used to process the surface of the stainless steel with the sanding craft.
2. Q: What is the name of the machine?
A: No.4 polishing machine.
3. Q: What is the latest shipping date of the production line?
A: It needs 45 days to manufacture the whole production line.
4. Q: Are you a factory or trading company?
A: Factory. Specializing in manufacturing and designing by customer.
5. Q: What is the packing and shipping?
A: The polish line would have a test of the finished running before the shipment, then we would pack the whole main machine in the 40HQ container, or the other assemble machine will be put into the wooden box to put into the 40 HQ.
6. Q: How many days for the engineer to install the production line in foreign country?
A: It possible needs 30 days. Before the equipment arrival, user must prepare the infrastructure, we would arrange the after sale service to adjust and install.
7. Q: How to choose the suitable group for plate?
A: In general, the production line could be assembled the suitable spindle adjust the parameter of the stainless steel plate.
Contact us:
Website: http:// ouyigang.en.made-in-china.com
Address: The 6th Chengye Road, Gangbei Industrial Area, Chencun Town, Shunde District, Foshan City, Guangdong Province, China.