SB video of the machine
The video of the
No.4+ SB+HL sanding production line.
It process the plate by the
hydraulic un-coiler to entry the plate into the main machine.
For stainless steel polishing machine, the sanding pattern base on the customer choice, if need the stainless steel to SB polishing machine, the part of the machine will be processed plate only with the sanding pattern of SB.
It could process the machine more than
60 m/ min, the produciton of the one line over
1500 ton/ month.
SB polishing machine could be processed the plate with the
abrasive belt or the abrasive roller.
During the sanding pattern, it also need the
water and oil.
Product Description
The basic plate selection should preferably be of No.4 satin surface stainless steel sheet and should be subjected to polish with abrasive wheels or pads.
The application verticals of this finish to name a few are in architecture decoration, elevators and escalators, furniture, etc.
The line of the polishing machine, it needs the stainless steel plate with the SB sanding pattern, and for process, the sanding roller to process the plate.
The size of the sanding roller is based on the size of the plate.
Grinding head up and down around the irregular swing grinding, sand frame grinding head strong and stable, high-speed grinding, sand uniform and smooth, efficient, frequency control.
CNC operation interface is convenient, simple and efficient.
Mixed with water and oil grinding, plate deformation is small, improve the belt life, high grinding efficiency.
Ouyigang award received
The testing of the sanding abrasive crafts
Question and Answer
1. Q: What is the usage of the machine?
A: It used to cover the film on the surface of the stainless steel plate to protect the sanding craft.
2. Q: What is the name of the machine?
A: Laminator.
3. Q: What is the latest shipping date of the production line?
A: It needs 45 days to manufacture the whole production line.
4. Q: Are you a factory or trading company?
A: Factory. Specializing in manufacturing and designing by customer.
5. Q: What is the packing and shipping?
A: The polish line would have a test of the finished running before the shipment, then we would pack the whole main machine in the 40HQ container, or the other assemble machine will be put into the wooden box to put into the 40 HQ.
6. Q: How many days for the engineer to install the production line in foreign country?
A: It possible needs 30 days. Before the equipment arrival, user must prepare the infrastructure, we would arrange the after sale service to adjust and install
7. Q: How to choose the suitable group for plate?
A: In general, the production line could be assembled the suitable spindle adjust the parameter of the stainless steel plate.
Contact us:
Address: FACTORY NO. 19, XIANGLIANG ROAD HECHENG STREET GAOMING DISTRICT FOSHAN CITY GUANGDONG PROVINCE CHINA.