The No.8 buffing machine video
This is sheet to sheet buffing machine in No.8 sanding pattern.
The fully automatic vacuum plate for the stianless steel polishing machine, it suck the plate to the transmit table, then the transmit table fetch the plate into the main machine.
The No.8 buffing machine process the plate with the grining head by high speed rotating, the liquid and the grinding material to help process the plate.
After processing, the process procedure of the plate is cleaning and drying the plate.
Finally, it covered with the laminating film and un-feeding by the automatic suck vacuum plate.
Product features
a) The line procedure control by the panel, each lifting and downing of the grinding head could be controled in the panel and the altitude of the head could be accurate in 1 degree.
b) Whole line could stop by the one emegercy switch
c) Speed of the line is 1-10 m/ min, it could adjust the suitable speed based on the plate thickness
d) Internet remote control, we provide the remote technology inguidence to the user.
e) The rotating speed of the plate could be over 506 r/min
Product details
1) The 8K Mirror polishing machine specialize in buffing the surface of the sheet and coil with the water and Al2O3, let the sheet and coil sanding pattern is mirror.
2) The Surface Gloss is over 620.6 after finished. (Before 525.8)
3) The surface roughness is below 0.15.
4) The speed of the machine is very slow, in order to keep the sheet and coil under the enough mechanical reaction.
5) Whole of the production line, the main production of the 8K is over 700 Ton/ once month.
6) And the production line should cover more than 40*8 square meters.
7) The grinding head change to the new ones, need the sheet to clean the dirty stuff to keep the buffing result, the final operation being done with extremely fine buffing compounds. The final surface is blemish free with a high degree of image clarity and is the true mirror finish.
Production Line Description
Length |
Approxiately 40 m |
Width |
Approxiately 8 m |
Water supply |
10 cbm/ hour |
Electricty supply |
It is up to power by customer, then the KW decide the electricty |
The grinding liquid |
Acid Mist |
The grinding material |
stainless steel plate processed by the cotton woolen and Al2O3 |
The maintain( grinding head) |
It need to change the grinding head each 2 weeks |
Speed |
1-10 m/ min |
Production |
Approxiately 700 ton/ mont |
Company Description
Foshan City Ouyigang CNC Machinery Co., Ltd is a manufacture engaged in producing polishing machines over 19 years.
The main products of us are including 8K mirror finish polishing machine, SB, HL.
A lot of customers who use our machine over than 20 years and still using now.
Besides, we are makers by ourselves, not machine we can design any type's machine according to the demand of customers.
We offer professional technique and services to our customers, service overseas is provided by our company.
We look forward to become your most valuable partner in the future. Let us create a wonderful future!
Cooperation
Test and management system
Before the installing the production line, we have our QC to check with the stainless steel assemble parts for the each part of the machine, the QC is responsible for the fitting quality until the line shipment delivery.
After finished, we will check the function of the each main machine by electricity, even some buyer will come to our factory to check the processing crafts on the spot.
That is the picture of the testing the processing crafts.
Packing and shipment
It was covered the transparent film on the surface of the stainless steel buffing machine, then it will dispatch in the 40 HP container, the machine will be tighted with the iron wire.
Question and Answer
1. Q: What is the usage of the machine?
A: It used to cover the film on the surface of the stainless steel plate to protect the sanding craft.
2. Q: What is the name of the machine?
A: sheet to sheet stainless steel buffing machine, production line.
3. Q: What is the latest shipping date of the production line?
A: It needs 45 days to manufacture the whole production line.
4. Q: Are you a factory or trading company?
A: Factory. Specializing in manufacturing and designing by customer.
5. Q: What is the packing and shipping?
A: The polish line would have a test of the finished running before the shipment, then we would pack the whole main machine in the 40HQ container, or the other assemble machine will be put into the wooden box to put into the 40 HQ.
6. Q: How many days for the engineer to install the production line in foreign country?
A: It possible needs 30 days. Before the equipment arrival, user must prepare the infrastructure, we would arrange the after sale service to adjust and install
7. Q: How to choose the suitable group for plate?
A: In general, the production line could be assembled the suitable spindle adjust the parameter of the stainless steel plate.
Contact us:
Website: http://ouyigang.en.made-in-china.com
Address: The 6th Chengye Road, Gangbei Industrial Area, Chencun Town, Shunde District, Foshan City, Guangdong Province, China.