The video of the hydraulic coiler
The machine is used for the coil to coil stainless steel polishing line, it could cover the coil in the whole time, and keep moving by control panel, the stainless steel polishing machine need the plate entry the main machine with a stable speed, so it also control with the speed in the control panel.
Product Description
1)The hydraulic coiler and un-coiler hold the coiler to process, it assemble with the stainless steel cart, which upper and move by the control panel and it could also weight the 15-20 ton.
2) The bearing of the hydraulic coiler, it could swell the size of bearing tube to match the size of the stainless steel coil ID.
The biggest bearing weight |
10T |
Net weight |
5 T |
Size |
1250*1500*1800 mm |
weight |
9 T |
power |
It based on the customer's requirment |
Essential parameters and an innovative graphical user interface (GUI) grant an extraordinary easiness of use.
The capability of saving, recalling and interchanging the working parameters reduces, even more the setup and start-up time of the new line.
Product Details
Company Description
Ouyigang Co. Ltd is the representative office for polishing machine factory( built in 1999)in Foshan City, Guangdong Province, China.
It is one Hour and a half hours from Guangzhou south station and Ouyigang.
Ouyigang keep superior quality and competitive offers for global valued customers.
We have a lot of customers who use our machine over than 20 years and still using now.
Besides, we are makers by ourselves, not machine we can design any type's machine according to the demand of customers.
We offer professional technique and services to our customers, service overseas is provided by our company. We look forward to become your most valuable parameter in the future.
Let us create a wonderful future!
Packing and shipment
It was covered the transparent film on the surface of the stainless steel buffing machine,
then it will dispatch in the 40 HP container, the machine will be tighted with the iron wire.
Question and Answer
1. Q: What is the usage of the machine?
A: It used to cover the film on the surface of the stainless steel plate to protect the sanding craft.
2. Q: What is the name of the machine?
A: coil to coil stainless steel polishing machine, production line.
3. Q: What is the latest shipping date of the production line?
A: It needs 45 days to manufacture the whole production line.
4. Q: Are you a factory or trading company?
A: Factory. Specializing in manufacturing and designing by customer.
5. Q: What is the packing and shipping?
A: The polish line would have a test of the finished running before the shipment, then we would pack the whole main machine in the 40HQ container, or the other assemble machine will be put into the wooden box to put into the 40 HQ.
6. Q: How many days for the engineer to install the production line in foreign country?
A: It possible needs 30 days. Before the equipment arrival, user must prepare the infrastructure, we would arrange the after sale service to adjust and install
7. Q: How to choose the suitable group for plate?
A: In general, the production line could be assembled the suitable spindle adjust the parameter of the stainless steel plate.
Contact us:
Website: http://ouyigang.en.made-in-china.com
Address: The 6th Chengye Road, Gangbei Industrial Area, Chencun Town, Shunde District, Foshan City, Guangdong Province, China.